A blog by Oleg Shilovitsky
Information & Comments about Engineering and Manufacturing Software

How to select PDM system in 5 simple steps?

How to select PDM system in 5 simple steps?
Oleg
Oleg
2 July, 2013 | 3 min for reading

Are you in the market for enterprise system? Traditionally, the process of enterprise software selection is long, complicated and expensive. The variety of requirements, combined with the complexity of systems, specific characteristics of company, vendors, implementation, support, licenses, etc. Whoever tried to do it at least once from any side (buyer or seller) will confirm you that it is not a simple thing to do.

Jim Brown of Tech-Clarity is well-known analyst in engineering and manufacturing software space published his research PDM Buyer’s Guide – Ensuring Maximum Value from Product Data Management. You can get an access to the summary paper by navigating your browser to the following link. If you want to get a full copy, you can do it here free of charge, but you will have pass you contact information to PTC. The guide provides a comprehensive overview of all aspects of PDM selection process started from the functional analyzes, vendor specific requirements, integration, scaling, sizing and many other aspects. Here is a picture, which outlines the framework proposed by Jim. If you are looking for PDM system, this paper is clearly “must read” materials.

One part of PDM buyer’s guide is related to integrations between CAD and PDM. Here is the passage you should pay attention.

PDM should be tightly integrated with underlying authoring tools such as 3D CAD in order to automatically manage the file relationships for assemblies. This is typically a key difference between solutions and should be evaluated closely, considering any multi-CAD control required. Tight integration with authoring tools should enable automatic revisioning, tracking, and traceability of design changes. Integration should include electronic design (ECAD) and software development in addition to mechanical CAD if those are applicable to your products.

PDM business was evolving for the last decade mainly around CAD business. CAD vendors leveraged the tight link between CAD and PDM solutions to deliver well integrated bundles. It was done to satisfy customers’ demands to control CAD portion of product data management. On the other side, it made a selection process sometimes silly and simple.

Jim’s paper made me think about how complicated and painful PDM selection process could be. At the same time, maybe we can pickup few important characteristics that will simplify the process for many companies? Here is my take on PDM Selection Tool for Dummies in 5 steps.

Step 1: If your company is using single CAD system, CAD/PDM bundle from the same vendor is your best choice.

Step 2: If your company is using multiple CAD systems, try to identify a strategic CAD system for your and follow CAD/PDM bundle from that CAD vendor. Check if other CAD integrations are supported as well before making a final choice.

Step 3: If your company has no dominant CAD systems (e.g. your company is a supplier and using multiple CAD systems required by you upper tier provider) and your company is looking how to manage CAD neutral product data structures (eg. BOMs), you need to look on PLM system.

Step 4: If your company is large and has multiple CAD systems, you probably want to have a dedicated PDM system managing every single CAD combined together with PLM or ERP system.

Step 5: If you company is looking how to manage product development processes beyond controlling and sharing CAD (product) data, you need to evaluate PLM system. Don’t make a PDM choice without making your PLM decision first.

What is my conclusion? Simplicity is a key. We can clearly see “simplification” as an important trend these days. Companies are looking for solutions to solve their problems, but they want to make it simple. CAD/PDM integration requirement is a reality of today’s PDM business. We cannot go away without integration between CAD and PDM/PLM. Even the number of characteristics is huge, by focusing on few specific ones, you can save lot of time during the selection process. Just my thoughts…

Best, Oleg

Recent Posts

Also on BeyondPLM

4 6
15 November, 2016

I’m at AU2016 this week. Yesterday, I had a chance to attend Autodesk Forge Dev Day. It is a  gathering...

5 January, 2016

Almost hundred years ago Henry Ford started to build River Rouge factory. That was a giant plant that literally took...

2 June, 2024

Data is playing a key role in engineering and manufacturing processes these days. In the past, companies relies on drawings...

1 April, 2022

I’m coming from the first in-person PLM conference that happened yesterday in Ann Arbor, MI. It was a great place...

5 June, 2015

I have an unusual post for this weekend. It is related to big data stories on my blog. Big Data...

11 February, 2009

Directly from SolidWorks World   In my previous posts, I discussed the technological possibility of leveraging the social platform capability...

27 July, 2017

There are different levels of PLM implementation complexity – long planning, budget overrun, customization delays. Tons of articles are written...

8 April, 2020

It is time for roller-coaster emotions. I feel like I’m toggling all the time between several states of mind –...

23 October, 2019

Digital Transformation is in the air. Every company these days is transforming itself into a future digital universe. There are...

Blogroll

To the top