A blog by Oleg Shilovitsky
Information & Comments about Engineering and Manufacturing Software

Improve organizational performance by the management of multiple Bill Of Materials

Improve organizational performance by the management of multiple Bill Of Materials
olegshilovitsky
olegshilovitsky
10 February, 2009 | 2 min for reading

Organizations today are looking for ways to improve their performance. I think that the right tools (or right technologies) can help them. One of them is the technology to manage multiple Bill of Materials. Why do I think this is important? I tried to analyze how people in organizations work and discovered that their work is very sequential: design-engineering-manufacturing planning, etc. Each step depends on the previous one. On the other side, it is rare that using single steps from design to manufacturing can create final results as designers and engineers need to work in cycles. Unfortunately, I haven’t seen many tools that can allow to these engineers and designers to work on the same content together. For each step, they need to release information early and move onto the next step and be able to co-edit – this is the only way to improve productivity. It also helps if you don’t lose time on communication and data translation.

 Management of multiple Bill of Materials can resolve the bottleneck typical in product development. What can we do practically? We need technologies that allow us to manage multiple structure of information – design, engineering, manufacturing –at the same time. If we can do this, users will be able to co-edit this data without waiting in line until each person in this design-to-manufacturing game finishes his or her work. Today, a lot of time is wasted while waiting for somebody else to finish his or her work.. The second part of this technology will be to eliminate the need for second and third manual data entry. The third and most important part will be the ability to work in cycles where changes are synchronized between multiple structures.

 One possible way (this is just to make our discussion more practical) is to create a model for multiple BOMs, will be a 3D matrix of data with the following dimensions:

 (1) Bill of Material (actual data structure);

(2) Bill of Material Type or Role (engineering, manufacturing etc.);

(3) Changes (represents level of maturity);

 These 3-dimensional data structure will allow you to link relevant information between design, engineering and other domains of data and manage changes simultaneously.multibom

 Efficient management of multiple BOMs will resolve bottlenecks and improve organizational performance. I think, the ability to manage these multiple Bill-Of-Materials will be a key capability of the next PLM systems. Although today there are systems that let you work with Bill of Materials, their main disadvantages is that they need people to invest their time into transforming one data structure into another.

 

Disclaimer: I’m co-founder and CEO of OpenBOM developing cloud based bill of materials and inventory management tool for manufacturing companies, hardware startups and supply chain. My opinion can be unintentionally biased.

Recent Posts

Also on BeyondPLM

4 6
19 May, 2016

The amount of digital data is growing at an exponential rate.  We are doubling data every two year. The rate...

3 June, 2009

Short note: I see many BPM vendors are running to provide Business Process Management solution on cloud / SaaS.  What...

12 June, 2015

PI Congress is coming to Boston this year. The program just became available online and you can see it here....

15 December, 2011

Let’s talk about emails today. How many of them are you reading or writing daily? A lot? Emails are with...

25 May, 2016

Disclosure: As a co-founder of openBoM, I understand that my opinion and thoughts about future challenges can be unintentionally biased....

10 November, 2014

Engineering.com article by Verdi Ogewell earlier today is introducing a next step of PLM vs. ERP battle for ownership of...

8 July, 2015

To manage business processes across the manufacturing organization is not a simple job. This is a problem product lifecycle management...

3 May, 2011

One of my blog readers asked me few questions about managing of effectivity. I decided to share this information. In...

26 July, 2017

Software is eating the world. And products that we know in the past as purely mechanical, today have strong dependencies...

Blogroll

To the top