5 Things PLM Vendor Won’t Tell You But Should

5 Things PLM Vendor Won’t Tell You But Should
Oleg
Oleg
12 June, 2021 | 4 min for reading

PLM is the system, technology, and process at the heart of your product development. It is a central control point to manage your product data and processes. From one side, it sounds very simple – data gets in and data goes out. Your data such as design files, engineering information, and all related pieces of data are entered in the PLM system, shared with your team. controlled by the people with the right level of access and once the work is released will become a place to trace the historical data about what happened with your product during the design, manufacturing, and maintenance stages. It is also a control center to manage your change process.

Even it sounds simple, the decision about PLM system is not that simple and manufacturing companies are spending a lot of time trying to decide what is the right system, will the system and technology fit the process, and how companies will switch from the state of doing business today into a new state of the business with PLM system on.

From the experience of consulting many companies and working with many vendors and also serving many customers, these are five things I wish every PLM vendor will tell their future customers before embarking on a PLM project.

1- Data Planning

Even the smallest possible PLM implementation will demand organizational work and preparation. It will require your people and team to describe formally what data they want to manage, to define this information, and configure the PLM system to manage this information in the way it will fit the department and people. Usually, this conversation sparks a lot of debates about data and related activities and can preoccupy people in an organization for some time.

2- Legacy Data Import

To get existing data in the system is a substantial task that is usually heavily underestimated. Even the smallest manufacturing organization has tons of existing data in a variety of forms – Excel files, Access databases, and old applications of different kinds. To collect this data, clean it, sort it out, and import it to a new system takes time, effort, and resources. More importantly, this does not work that you can easily outsource to somebody, so money won’t solve all problems here.

3- Process Organization

Exactly in the same way, you will have to perform data planning, the processes will also require adjustments as soon as you move from the way you worked before the PLM project and afterward. And if you have a mess, don’t bring computer systems.  It will end up as a computerized mess. First, you need to sort out the mess, and then you can bring new systems and plan the work differently. Be ready to talk about it and do some work.

4- Data is only as good as you can access it

PLM systems and projects are usually sold as a way to organize a single version of the truth about the data, a way to organize information and keep it in order. What is often forgotten is that data is only as good as you can access it in the way you need. Don’t forget that once you are done, the PLM system will become the only way to access the information. You should be prepared that many people might have a temptation to export data in a good old Excel file to consume it and to return it back (just to control it). Although it can solve some adoption barriers, I don’t recommend it as a long-term solution. Therefore, check how data will be accessible and if it will satisfy the needs of all people in an organization.

5- Upgrade Process

Everything is changing and PLM systems are not an exception to this rule. How new features, functions, and fixes will be coming? How the system will be upgraded. How often it will happen and who will be responsible for this upgrade and functional adjustments. These questions exist for both on-prem and SaaS products and to address them upfront will help you better understand your future.

What is my conclusion? I wish PLM vendors will be more transparent about processes of system acquisition, implementation, and maintenance. Many of the questions and issues I mentioned above can be easily solved earlier in the process of PLM planning and to remove the stress of PLM implementation and delivery. Let me know if you have questions -I’m happy to discuss them with you. Meantime, be careful and thoughtful when you plan your next PLM journey. Just my thoughts…

Best, Oleg

Disclaimer: I’m co-founder and CEO of OpenBOM developing a digital network-based platform that manages product data and connects manufacturers, construction companies, and their supply chain networksMy opinion can be unintentionally biased.

Recent Posts

Also on BeyondPLM

4 6
8 May, 2012

Let’s talk nuts and bolts today. APIs.. If you think about any PDM / PLM implementation, the question about API...

13 November, 2021

For the last two decades, PLM was developed in the well-established business strategy, product, and technology discipline. A lot can...

20 October, 2014

Workflows and processes. This is an important part of any company. Like blood goes through your body, workflows are going...

8 June, 2009

We have been talking about collaboration a lot these days. I was thinking about how collaboration can happen with designers....

7 October, 2017

Dear Readers, This is a beginning of guest blogging on Beyond PLM. I welcome everyone to share your thoughts about...

30 September, 2017

Almost 2 years ago I asked a question – How many PDM systems SOLIDWORKS users need? I counted five PDM systems....

25 June, 2022

Earlier this week, I attended Autodesk Forge Data Day in Boston. I could not miss the event with such a...

22 September, 2010

Yesterday, I attended COFES Russia / isicad 2010 forum in Moscow. My presentation on the forum was about my view...

7 August, 2015

Aras Corp is making waves in PLM eco-system. The latest news about addition of Aibus to Aras customer list raised...