A blog by Oleg Shilovitsky
Information & Comments about Engineering and Manufacturing Software

ECO Management: What Matters?

ECO Management: What Matters?
Oleg
Oleg
30 March, 2011 | 3 min for reading

Engineering Change is probably one of the most important and complicated disciplines. I had a chance to meet people that told me – all what you are doing is about ECO management. You can see many examples of ECO management solutions. Almost every software vendor in the field of engineering and enterprise software will propose you kind of the solution. Here is the definition, I grab from Wikipedia about Engineering Change Order:

In a typical system development cycle, the specification or the implementation is likely to change during engineeringdevelopment or during integration of the system elements. These last-minute design changes are commonly referred to as engineering change orders (ECOs) and affect the functionality of a design after it has been wholly or partially completed. ECOs can compensate for design errors found during debug or changes that are made to the design specification to compensate for design problems in other areas of the system design.

However, product development process is very diversified when it comes to real manufacturing companies.  To find a system that can answer on the user’s requirements for ECO is not a simple task. In addition to that, the diversity of available solutions raises multiple questions about what is the most appropriate system for every case.

Engineering Change: Do It Yourself (DIY)?

Last year I posted – How to Manage ECO without paying $1’500 per seat? The point I wanted to make was about how reuse some of the modern technologies to simplify the overall ECO management in the organization. My conclusion was that different organizations can manage ECO differently depends on specific characteristics of product, company environment and organization, which can make DIY approach quite complicated. It made me think and analyze different packages implementing ECO solutions.

Arena Change Management

Take a look on this following video from Arena Solution. I found it very educational. The power of Arena on demand was clear to me in this example. The ability to have seamless access via cloud-based services (or how Arena called it in the beginning “on demand”) can keep all participants in sync regardless on location and time.

[youtube=http://www.youtube.com/watch?v=5gWuoCc00Ik]

Aras Workflow Management

What happens if your company has a high level of change processes complexity? The following video fragment is presenting Aras Innovator Workflow solution. It enables you to realize a comprehensive change process as a workflow. The workflow can be adapted to a specific customer needs. The openness and adaptability is an ultimate advantage of this system.
[youtube=http://www.youtube.com/watch?v=XBD03ggN_WE]

Kubotek ECO Manager

Few weeks ago, I learned about the new tool released by Kubotek. The interesting aspect I discovered in this tool is how it focuses on geometrical aspects of product and changes. It is clear not something you need in every industry. However, for the type of manufacturers in automotive, aerospace, industrial equipment and many other industries requiring 3D and geometry, Kubotec ECO manager can provide a significant value in the way to handle changes.

[youtube=http://www.youtube.com/watch?v=IIfXdK28I8k]

What is my conclusion? ECO is a an important, but very complicated process. It involves many people from organizational departments to work on this and following ECO related activities from inside and outside organization. To have an appropriate tool is important. When you choose a tool, take into the consideration what are specific characteristics of your organization from the standpoint of mobility, complexity, need for visual and 3D before you make a right choice. In parallel, the simplicity of a tool is another important thing. To have a simpler can be a much bigger problem for manufacturers in coming years.

Just my thoughts…
Best, Oleg

Freebie.

Recent Posts

Also on BeyondPLM

4 6
16 November, 2015

More than 10 years ago, I had a conversation with one of telecom manufacturing companies in Europe. I asked –...

7 February, 2019

How many times you stuck in PLM meeting by saying “What I actually mean is… “. PLM has one big...

27 March, 2015

I attended Develop 3D Live yesterday in Warwick UK. It is probably the only vendor independent event focusing on CAD, 3D,...

1 October, 2019

One of the most debated topics in PLM (and other enterprise software world) is so-called “Out-of-the-box” system. Long-time ago, PDM...

2 April, 2024

I’m continue to digest what I learned at CIMdata Industry Forum 2024 last week. The main theme of the forum...

22 March, 2018

I was invited to speak at Develop3D Live 2018 about Data Management. If you followed my blog earlier, you might...

15 July, 2010

My new website and blog is BeyondPLM. The original post is here. The question of identification is probably of the...

15 January, 2009

Even though, 2008 was year of financial crisis and instability, I still regard it as a remarkable year for the...

20 July, 2016

Nobody is surprised by the amount of distributed work we do these days. The time when designers, engineers and manufacturing...

Blogroll

To the top