A blog by Oleg Shilovitsky
Information & Comments about Engineering and Manufacturing Software

Design and Manufacturing: Top Down PLM approach with Treehouse?

Design and Manufacturing: Top Down PLM approach with Treehouse?
olegshilovitsky
olegshilovitsky
29 October, 2009 | 1 min for reading

The new release of SolidWorks Labs Threehouse V2 hit me to think again about Top Down approach and efficient communication between Design/Engineering and Manufacturing.


Background.
SolidWorks Labs released V2 of Treehouse. You can get more information on their website as well as take a look on multiple blog articles about that. My favorite was SolidSmack’s “Full Speed TreeBleed. SolidWorks Treehouse, Not Just a Treehouse“.

Design, Engineering and Manufacturing
Problem of disconnecting between Design/Engineering organization is not new, in my view and exists in many manufacturing organizations. It’s obvious Engineers sees a product they develop very much in the light, of how they build parts/sub-assemblies/assemblies/configurations models. For them this is what make sense. However, from manufacturing side, it always looks different because their structure is driven by assembly process, packaging, supply chain and other factors from a shop floor. Most of the systems today are not providing a good solution for this problem. Those customers that made decent solution in this space built it based on huge customization and service base.

Treehouse, Modular design and Top Down

In my view, Treehouse concept is interesting since it can provide a communication bridge between two worlds: design and engineering/manufacturing. The way to initiate design top-down in SolidWorks is not trivial and Treehouse can be an interesting approach to do so. It can facilitate modular design and ability to create new products and configuration top down initiated from Engineering/Manufacturing space.

What is your opinion on that? Have you had chance to think or implement the top-down approach in your organization? What systems you had in your mind to support it?

Best, Oleg

Recent Posts

Also on BeyondPLM

4 6
28 January, 2025

From time to time, I’m coming to discuss the intersections of engineering software and PLM. Here are some of my...

8 December, 2009

Some thoughts about how Microsoft’s futuristic commercials can be connected to Google’ reality. Yesterday announcement of Visual Search or how...

14 December, 2008

    I want to continue my first PLM Glue Technologies topic (#1 was about data). Sunday is good time...

18 March, 2011

What do you think about SharePoint? During the last few months, I’m getting this question very often. After my post...

4 December, 2014

Integration is a big deal. When it comes to enterprise organizations and specifically manufacturing companies of different kinds, enterprise integration...

14 January, 2010

I’d like to share some thoughts today following yesterday’s Mass Innovation Night in IBM Center in Waltham, MA. This is...

24 February, 2017

It has been almost 5 years since Autodesk turned the switch “PLM cloud” on. Tech-clarity blog – Autodesk’s announced PLM...

29 October, 2017

Bob Evans’ Forbes article  – Why Amazon Won’t Catch #1 Microsoft In The Cloud: Because It’s All About Software caught my...

25 July, 2011

I can see cloud PLM is trending. The announcements about running on Amazon are coming from multiple vendors. Dassault just...

Blogroll

To the top