A blog by Oleg Shilovitsky
Information & Comments about Engineering and Manufacturing Software

Design and Manufacturing: Top Down PLM approach with Treehouse?

Design and Manufacturing: Top Down PLM approach with Treehouse?
olegshilovitsky
olegshilovitsky
29 October, 2009 | 1 min for reading

The new release of SolidWorks Labs Threehouse V2 hit me to think again about Top Down approach and efficient communication between Design/Engineering and Manufacturing.


Background.
SolidWorks Labs released V2 of Treehouse. You can get more information on their website as well as take a look on multiple blog articles about that. My favorite was SolidSmack’s “Full Speed TreeBleed. SolidWorks Treehouse, Not Just a Treehouse“.

Design, Engineering and Manufacturing
Problem of disconnecting between Design/Engineering organization is not new, in my view and exists in many manufacturing organizations. It’s obvious Engineers sees a product they develop very much in the light, of how they build parts/sub-assemblies/assemblies/configurations models. For them this is what make sense. However, from manufacturing side, it always looks different because their structure is driven by assembly process, packaging, supply chain and other factors from a shop floor. Most of the systems today are not providing a good solution for this problem. Those customers that made decent solution in this space built it based on huge customization and service base.

Treehouse, Modular design and Top Down

In my view, Treehouse concept is interesting since it can provide a communication bridge between two worlds: design and engineering/manufacturing. The way to initiate design top-down in SolidWorks is not trivial and Treehouse can be an interesting approach to do so. It can facilitate modular design and ability to create new products and configuration top down initiated from Engineering/Manufacturing space.

What is your opinion on that? Have you had chance to think or implement the top-down approach in your organization? What systems you had in your mind to support it?

Best, Oleg

Recent Posts

Also on BeyondPLM

4 6
8 September, 2009

I want to touch today topic related to user experience in various PLM systems. Having such powerful function as 3D...

16 December, 2012

The simplicity of DropBox and similar cloud based file storage makes it very attractive to many people. Engineers are not...

5 October, 2019

I’m coming to PI PLMx conference in San Diego which will take place next month in beautiful San Diego. Organized...

9 March, 2010

I think, it is always fun to talk about next disruption. When you are doing so, you have a real...

3 May, 2016

Engineering.com article PLM This Week: An All-Time High for Arena yesterday brings a news about another record quarter of Arena Solutions...

1 July, 2009

I want to discuss Enterprise 2.0. This term started to be popular during the last two-three years and stands for...

22 June, 2015

When it comes to PLM and ERP, you may always get some feeling of rivalry at the air. PLM and ERP...

24 January, 2013

Many years ago, one of my mentors told me that “the worst pencil is better than the best memory”. I...

26 May, 2010

If you think about the future of enterprise systems, this is a “must see” video presentation. Core Content and the Cloud...

Blogroll

To the top