A blog by Oleg Shilovitsky
Information & Comments about Engineering and Manufacturing Software

Design and Manufacturing: Top Down PLM approach with Treehouse?

Design and Manufacturing: Top Down PLM approach with Treehouse?
olegshilovitsky
olegshilovitsky
29 October, 2009 | 1 min for reading

The new release of SolidWorks Labs Threehouse V2 hit me to think again about Top Down approach and efficient communication between Design/Engineering and Manufacturing.


Background.
SolidWorks Labs released V2 of Treehouse. You can get more information on their website as well as take a look on multiple blog articles about that. My favorite was SolidSmack’s “Full Speed TreeBleed. SolidWorks Treehouse, Not Just a Treehouse“.

Design, Engineering and Manufacturing
Problem of disconnecting between Design/Engineering organization is not new, in my view and exists in many manufacturing organizations. It’s obvious Engineers sees a product they develop very much in the light, of how they build parts/sub-assemblies/assemblies/configurations models. For them this is what make sense. However, from manufacturing side, it always looks different because their structure is driven by assembly process, packaging, supply chain and other factors from a shop floor. Most of the systems today are not providing a good solution for this problem. Those customers that made decent solution in this space built it based on huge customization and service base.

Treehouse, Modular design and Top Down

In my view, Treehouse concept is interesting since it can provide a communication bridge between two worlds: design and engineering/manufacturing. The way to initiate design top-down in SolidWorks is not trivial and Treehouse can be an interesting approach to do so. It can facilitate modular design and ability to create new products and configuration top down initiated from Engineering/Manufacturing space.

What is your opinion on that? Have you had chance to think or implement the top-down approach in your organization? What systems you had in your mind to support it?

Best, Oleg

Recent Posts

Also on BeyondPLM

4 6
9 August, 2019

One of the most commonly used PLM sales scenarios is to sell it as an expansion of existing PDM system....

7 May, 2011

A week ago, I came back from ACE 2011 (Aras Community Event 2011), which took place in Detroit, MI. Let...

9 October, 2009

The new efficiency is where cost saving, productivity and innovation meet. I was reading “The New Efficiency” letter from Steve...

11 August, 2010

I’ve been reading Ray Kurland interviewing Rich Allen of Dassault Systems SolidWorks Corp. about the future of SolidWorks’ cloud solutions....

6 May, 2019

I’m coming to the Digital Factory Boston conference tomorrow. The conference is organized by Formlabs (formlabs.com). The program will be...

26 October, 2011

BAM! Aras just announced Enterprise PLM for SolidWorks. Here is the new article – Enterprise PLM for Enterprise PDM. Navigate...

24 October, 2022

PTC is moving to SaaS. The move started with the acquisition of Onshape and turning it into the Atlas platform....

13 May, 2017

Aras is buzzing PLM industry. Aras PLM gradually took a position to challenge big 3 PLM vendors – Dassault Enovia, Siemens’ Teamcenter...

14 February, 2011

Apple is trending these days. Not surprising me. At the same time, I don’t want to make this post a...

Blogroll

To the top