A blog by Oleg Shilovitsky
Information & Comments about Engineering and Manufacturing Software

Design and Manufacturing: Top Down PLM approach with Treehouse?

Design and Manufacturing: Top Down PLM approach with Treehouse?
olegshilovitsky
olegshilovitsky
29 October, 2009 | 1 min for reading

The new release of SolidWorks Labs Threehouse V2 hit me to think again about Top Down approach and efficient communication between Design/Engineering and Manufacturing.


Background.
SolidWorks Labs released V2 of Treehouse. You can get more information on their website as well as take a look on multiple blog articles about that. My favorite was SolidSmack’s “Full Speed TreeBleed. SolidWorks Treehouse, Not Just a Treehouse“.

Design, Engineering and Manufacturing
Problem of disconnecting between Design/Engineering organization is not new, in my view and exists in many manufacturing organizations. It’s obvious Engineers sees a product they develop very much in the light, of how they build parts/sub-assemblies/assemblies/configurations models. For them this is what make sense. However, from manufacturing side, it always looks different because their structure is driven by assembly process, packaging, supply chain and other factors from a shop floor. Most of the systems today are not providing a good solution for this problem. Those customers that made decent solution in this space built it based on huge customization and service base.

Treehouse, Modular design and Top Down

In my view, Treehouse concept is interesting since it can provide a communication bridge between two worlds: design and engineering/manufacturing. The way to initiate design top-down in SolidWorks is not trivial and Treehouse can be an interesting approach to do so. It can facilitate modular design and ability to create new products and configuration top down initiated from Engineering/Manufacturing space.

What is your opinion on that? Have you had chance to think or implement the top-down approach in your organization? What systems you had in your mind to support it?

Best, Oleg

Recent Posts

Also on BeyondPLM

4 6
11 December, 2008

Organizational expectation from PLM implementation is to organize entire lifecycle process of product in organization. With this expectation PLM positioned...

30 July, 2023

You cannot modern products using outdated and old technologies. Designing and building products is a complex process and you better...

2 December, 2020

Teamcenter X: Future Ready Cloud PLM says Siemens’ website invites you to try Teamcenter X for 30 days. If you...

15 December, 2023

Earlier this week, I attended CIMdata webinar. The goal for webinar was to provide a brief review of PLM economy...

1 December, 2008

 I spent most of my long Thanksgiving weekend break out of PLM-ish world. Also it was Black-Friday, so world around...

19 October, 2009

For many years Maps are one of the most popular ways to interact with the environment. In my view, thinking...

3 May, 2010

Few weeks ago, I had chance to post about PLM Data Model. I think, PLM space has a real lack...

17 January, 2020

Unless you live under the rock for the last few years, you’ve heard about DevOps. So, for starters, this is...

14 February, 2018

It took me few days to catch up on my writing about Solidworks World 2018. But I’m not done yet....

Blogroll

To the top