A blog by Oleg Shilovitsky
Information & Comments about Engineering and Manufacturing Software

Design and Manufacturing: Top Down PLM approach with Treehouse?

Design and Manufacturing: Top Down PLM approach with Treehouse?
olegshilovitsky
olegshilovitsky
29 October, 2009 | 1 min for reading

The new release of SolidWorks Labs Threehouse V2 hit me to think again about Top Down approach and efficient communication between Design/Engineering and Manufacturing.


Background.
SolidWorks Labs released V2 of Treehouse. You can get more information on their website as well as take a look on multiple blog articles about that. My favorite was SolidSmack’s “Full Speed TreeBleed. SolidWorks Treehouse, Not Just a Treehouse“.

Design, Engineering and Manufacturing
Problem of disconnecting between Design/Engineering organization is not new, in my view and exists in many manufacturing organizations. It’s obvious Engineers sees a product they develop very much in the light, of how they build parts/sub-assemblies/assemblies/configurations models. For them this is what make sense. However, from manufacturing side, it always looks different because their structure is driven by assembly process, packaging, supply chain and other factors from a shop floor. Most of the systems today are not providing a good solution for this problem. Those customers that made decent solution in this space built it based on huge customization and service base.

Treehouse, Modular design and Top Down

In my view, Treehouse concept is interesting since it can provide a communication bridge between two worlds: design and engineering/manufacturing. The way to initiate design top-down in SolidWorks is not trivial and Treehouse can be an interesting approach to do so. It can facilitate modular design and ability to create new products and configuration top down initiated from Engineering/Manufacturing space.

What is your opinion on that? Have you had chance to think or implement the top-down approach in your organization? What systems you had in your mind to support it?

Best, Oleg

Recent Posts

Also on BeyondPLM

4 6
30 July, 2023

You cannot modern products using outdated and old technologies. Designing and building products is a complex process and you better...

22 February, 2012

I’m just few hours before two-day marathon of PLM Innovation 2012 in Munich. The list of speakers and the agenda...

23 September, 2019

There is no lack of PLM definitions in this world. From a very simple like the version provided by Al...

28 June, 2024

Earlier this week, I was talking to one of our prospects – large industrial company that was looking for a...

26 August, 2010

I read one of the latest VEKTORRUM re-posts about Autodesk and PLM. Navigate your browser to the following link and read the original...

31 October, 2021

Earlier last week, the founder and CEO of Facebook Mark Zuckerberg introduced to the world a new vision of Meta....

2 August, 2012

Cloud PLM conversation is heating up. With all pros and cons, the opinion, I can hear very often – cloud...

6 August, 2009

I had chance to write about different aspects related to SharePoint and Product Lifecycle Management. Since many of the organization...

1 August, 2020

Back in the old days, the phone was the primary way to get a report about customer problems. Getting a...

Blogroll

To the top