I’m continuing with a set of ‘back to basics’ questions and discussion. My topic today is about singularity or what known in PLM as “a single point of truth”. I remember the time before computers were widely spread in engineering and manufacturing organizations and people used “Drawing on the wall”. The famous statement back to that time was – if you see drawing on the wall, think maybe there is “another wall”. Computers supposed to resolve the problem of multiple walls. However, the problem becomes even worst. Now you may have an unlimited number of “electronic walls” in your email system, disk on your laptop, server in your location or different enterprise systems. PLM comes with a very promising and illusive statement about single point of truth. From PLM standpoint, it defined as capability (or ability) to manage single (or unique) version of product data in your organization.

Now, my questions today about how to manage this uniqueness? Is it something you can see as an achievable goal for your next PLM implementation or wishful thinking? Is it something we can realistically implement in the organization with all systems we have in place? Can we achieve it in a single shot, or we need to have multiple steps to get there?

Here is my take on this (and I’m making it the most provoke as I can think about).

1. PLM Singularity (or single point of truth) represents a fundamental interest of people in the organization to organize and manage product data.
2. We can implement it in the organization, but it requires a significant effort that may vary depends on organization complexity and number of other systems involved into product development process and number of geographical locations company plan to cover by this system.
3. Implementing of singularity may take multiple steps until it will be achieved in the organization.

So, what is my conclusion today? I think, singularity cannot be considered as a goal for PLM implementation. The final cost can be too heavy to carry, and it will take long time to get there. Realistic PLM implementation need be done as “go by steps” approach. Each step will achieve goals helping organization to resolve specific issues they have in the organization or optimize existing processes. This is the only way to create something I’d call – lean PLM. If you want to implement single point of truth, think about playing “singularity chess” before :). (thanks, Paul Burgess blog for picture)


Just my thoughts. I’m looking forward to your comments.
Best, Oleg

Recent Posts

Also on BeyondPLM

4 6
27 October, 2023

In the fast moving world of manufacturing, to have company to perform to achieve a certain level of efficiency, to...

3 February, 2009

I’m still dreaming about social Bill of Material tools for organizations. I’ve been  thinking about being able to co-develop a...

29 March, 2013

For many years the business model of CAD, PDM and later PLM vendors was structured as high upfront license combined...

7 July, 2013

One of the looongest US weekends I remember  is going to end. This is a time to get back from...

10 May, 2010

I’m getting back to my thoughts related to Social Software and Product Lifecycle Management. Jim Brown defined the role of...

13 July, 2010

The complexity is probably the biggest problem that exists in PLM today. How can we resolve it? Siemens HD PLM...

16 November, 2016

I attended Autodesk University 2016 opening keynote yesterday. 10’000 people crowd, crazy loud music and future vision of engineering software....

21 October, 2013

Shake-ups are not a surprise these days. It happens all the time and especially in technological fields. The last decade...

1 June, 2015

Traditional PLM wisdom says to buy PLM system is a complex process. Once you decided for a specific platform or...

Blogroll

To the top