A blog by Oleg Shilovitsky
Information & Comments about Engineering and Manufacturing Software

PLM Definition from Dassault System’s Al Bunshaft

PLM Definition from Dassault System’s Al Bunshaft
Oleg
Oleg
15 August, 2011 | 2 min for reading

As you probably know, I’m collecting PLM definitions coming out of vendors, industry analysts and just customers. Here are some links on blog posts with PLM definitions: PLM Definition – Multiple Dimensions by Prof. Eigner, PLM Definition – Corporate vs. Consumer Style?, PLM Definition – Next Round?

I had a chance to read Boston Globe interview with Al Bunshaft of Dassault System. Navigate your browser to the following link to read it. In two pages, you will have a US-based perspective on what Dassault is thinking about CAD, PLM, Simulation and other related topic. However, the following passage caught my attention.

Q. Product lifecycle management (PLM) is the core product at Dassault Systems. How would you define PLM?

A. The most important word of those three is lifecycle. That’s what makes it more than just design. It’s managing the lifecycle of an innovation, from when it starts with a concept, an idea, and goes into requirements, definition, and the design phase. Then you have to simulate it. You can even simulate the manufacturing environment. After that we can track changes, parts changes, and defects.

So, what is my take? I found Mr. Bunshaft PLM definition quite balanced. Lifecycle is always a hot topic in every PLM discussion and an important element of PLM strategy.  At the same time, lifecycle is also one of the biggest challenges in every PLM implementation. Let think about ECO as one of the fundamental elements of Product Lifecyle – the implementation of ECO management is still complicated and expensive. In the end of the last week, I posted about Total Integration and the Future of PLM last week. This post included some examples of Siemens PLM strategies in this space and raised active conversation with people about TLCMS (Total Lifecycle Management System). It is interesting to see how lifecycle oriented strategies will be converted into future products and technologies. What is your opinion?

Best, Oleg

Recent Posts

Also on BeyondPLM

4 6
11 March, 2017

Almost 10 years ago, Gartner defined IT obsolescence management as major emerging issue. Here is a passage from old the old article...

20 December, 2025

A reader wrote to me recently with a question that echoes one I’ve been wrestling with for months: Do PLM...

6 March, 2019

User interface or how we more often call it these days “user experience” (UX) is tough. Enterprise systems, PLM and CAD...

20 September, 2016

The last decade of open source, mobile and web development taught us that to create software can be easy. Don’t...

2 April, 2009

In my previous post “Search for the right BOM – I’m feeling lucky? “, I started to discover possible ways to...

3 May, 2011

The ability to use PLM in downstream applications was always a challenge. There are multiple reasons for that – complexity...

6 March, 2015

The question how to implement PLM cloud is one of the most confusing when it comes to the decision about choosing...

30 August, 2010

I’m continuing discussions about PDM vs. PLM differences. I’d encourage you to take a look on my previous two posts...

26 May, 2011

Services is a significant part of every PLM implementation. According to CIMData, about 60% of cPDM revenues is coming from...

Blogroll

To the top